When should you lock out equipment?

When should you lock out equipment?

Even tasks like lubricating, cleaning, unjamming, or changing the attachments must follow the proper lockout procedure. Essentially, if your people work in or on machines that could smash, cut, shock, trap, burn, or injure in any other way an employee you are better off having a lockout tagout program in place.

What steps do you take to lockout/tagout equipment?

The eight basic steps to a LOTO procedure are as follows:

  • Prepare for the shutdown.
  • Notify affected employees.
  • Shut down the equipment.
  • Isolate energy sources.
  • Apply LOTO devices to energy sources.
  • Release/control all stored energy.
  • Verify the lockout.
  • Maintain the lockout.

What is the first step in locking out any equipment?

Lockout/Tagout Step 1: Preparation The first step of locking and tagging out equipment for service and maintenance is to prepare. During the preparation phase, the authorized employee must investigate and gain a complete understanding of all types of hazardous energy that might be controlled.

How do you lockout?

Steps of a lockout/tag out program include:

  1. Prepare for shutdown.
  2. Notify all affected employees.
  3. Equipment Shutdown.
  4. Isolation of system from hazardous energy.
  5. Dissipation (removal) of residual or stored energy.
  6. Lockout/Tag out.
  7. Verify Isolation.
  8. Perform Maintenance or Service Activity.

Do lockout locks have to be red?

Reply: Color is not the only prescribed factor for the standardization of lockout and tagout (LOTO) devices. At a minimum, a lock’s shape, or size, or color must provide employees with the capability to identify and distinguish a lockout device from other similar devices (e.g., security locks) in the workplace.

What must be performed immediately after locking out electrical equipment?

Shut Down – Power down the machine or equipment. Inform employees that will be affected by the shutdown of the equipment. Isolation – Make sure all sources of energy have been isolated. Turn off power, close valves, block moving parts, or disengage and block lines, etc.

When locking and tagging out equipment which of the following do you need to do before you shut off energy sources?

An effective lockout/tagout program should include the following eight steps.

  • Step 1: Detailed procedures for equipment.
  • Step 2: Notify affected employees.
  • Step 3: Shut down equipment properly.
  • Step 4: Disconnect all primary energy sources.
  • Step 5: Address all secondary sources.
  • Step 6: Verify the lockout.

What is the final step in a lockout?

Step 6: Isolation Verification – Lockout/Tagout This last step of the Lockout/Tagout safety is all about making sure. Yes, you’ve shut down or turned off the machines, isolated them from their root of the power, locked them out, and inspected for hazardous stored energy.

What is the last step before beginning work on equipment that is locked and tagged out?

Isolation Verification – This last step is about “making sure”.

What color must lockout devices?

Common practice is to use bright coloured (red) locks for high-risk operations, as most people recognise and aptly respond to this colour.

What are the four basic steps for a lockout?

Basic Steps of a Lockout/Tagout Process

  • Step 1: Identify energy sources and shut off energy to the affected equipment.
  • Step 2: Notify others – in particular all affected employees.
  • Step 3: Shutdown the equipment, using normal stopping procedures for the machine.
  • Step 4: Isolate the equipment from the energy source.

What to consider before starting a lockout program?

Also consider other hazards, such as moving equipment that must be secured before work begins. Once you’ve disconnected all primary and secondary sources of energy, attempt to start the equipment to verify that the lockout has been successful. Before you try to start it, verify that nobody is in a position where they could be hurt.

What do you need to know about lockout and tagout?

All switches, disconnects, or isolating devices needed to control the machine must be located and activated so that the equipment is isolated from the energy source (the power supply is shut off). Each worker who will work on the equipment applies a lock and tag to the lockout device.

What should I do after a lockout procedure?

Assuming that the procedures have been successful, return all switches and other equipment back to their “off” positions so the machine won’t start unexpectedly when the energy sources are reconnected.

What are the procedures for a Loto lockout?

Basic Lockout/Tagout Procedure 1 Prepare to Shut Down. All workers in the area are notified of the pending power shutdown and the lockout/tagout procedure. 2 Machine Shutdown. 3 Equipment Isolation. 4 Lockout/Tagout. 5 Stored Energy. 6 Verification of Isolation.